Premier Inn | Southampton

Podium Slab to First Floor

Atkin Trade Specialists delivered a Premier Inn in the heart of Southampton next to the ferry port. This six storey building provides 155 beds on the five upper floors with retail units on the ground floor.

Construction incorporated a concrete podium frame, built off displacement piles. The upper floors are Metsec Metframe constructions with holorib floors. Included in the metframe were the lifts and stairs that were built from the ground floor. The centre core stairwell was a spiral stairwell creating a feature for the building. The Metsec frame was built in 12 weeks, saving 3 weeks of the programme being constructed by only 4 men. Atkins provided a mobile tower crane that could reach all parts of the building to save time. The development achieved a BREEM 'Very Good' Rating.

Metsec Metframe Premier Inn

Client | Development Securities plc
Architect | ERP Architects
Contractor | Miller Construction
ATS Value | £750K
Floor Area | 3500m2
Programme | 13 weeks

 

INSTALLERS FOR METSEC METFRAME AND STEEL FRAMING SOLUTIONS (SFS)

Metframe is voestalpine Metsec’s modern, factory fabricated, pre-panelised framing solution. Manufactured off-site in a controlled, dry, high precision factory environment and installed by Atkin Trade Specialists.

Metsec Logo
FIS Logo
CHAS Logo