Moss Close | London
Apartments
Given the location of this development it was an ideal contract to use MetFrame.
The development was sandwiched between 2 existing buildings with limited access. To cope with the logistic issues panels were both fabricated and installed on site. This project was successfully fabricated and erected on site within a 10 week programme.